Page 9 - january23_122922.indd
P. 9

TAP TIMES          -9-                                   JANUARY 2023



                  Made in India (from 8)                        semiconductor fabs, investors have begun
                                                                planning chip assembly, perhaps compet-
        pany said it was investing $1 billion in its            ing with Tata.
        150,000 square foot facility. Its product
        line appears to be very basic.                          NAND Flash packaging
                                                                These include Sahasra Semiconductor, in-
        Budding, but “wobbly” infrastructure                    corporated in July 2020, which it claims is
        It may be decades, if ever, before India                India’s “first and only private company to
        boasts a semiconductor manufacturing                    start NAND FLASH IC packaging and test-
        industry like Silicon Valley, Silicon Gulch or          ing operations.”
        any region where advanced fabs are sited
        today.                                                  Its 2022 publicity says it will be located
                                                                in  Bhiwadi, Rajasthan and will begin trials
        As one critic told Reuters when asked                   and sample production by October 2022.
        about the lack of interest in setting up a              The company’s initial focus will be chip-
        wafer fab, “Firms are deterred by India’s               on-board, Micro SD cards moving on to
        wobbly infrastructure, unstable power su-               eMMCs and BGA parts.
        ply, bureaucracy and poor planning.”
                                                                India may follow, whether it wishes to or
        Ultimately, it may become a chip assembly               not, the same route as The Philippines,
        mecca for that region of the world.  Since              which became a major assembly and
        the government renewed its pursuit of                                                          next page



           CONTACT TECHNOLOGY VALIDATION & CHARACTERIZATION 5G and mmWAVE TEST EV and BATTERY TEST
                                                                     F
                                  F
                                                                                            F






                           March 5–8, 2023 Mesa, Arizona


                        NOW IN ITS 24th YEAR, TestConX has been
                        bringing together electronic test professionals

                        from around the world and connecting them
                        to state-of-the-art solutions.
                        Join your colleagues for four days of cutting-           Register now at testconx.org

                        edge presentations, networking, the latest
                        product exhibits, and Arizona sunshine.


                                             PREMIER SPONSOR





           HIGH SPEED DIGITAL TEST MODULE TEST SYSTEM LEVEL TEST PACKAGED SEMICONDUCTOR TEST BURN-IN
                                                                                                        F
                                                                       F
                                                   F
                                     F
   4   5   6   7   8   9   10   11   12   13   14